Detailed design

Wagga Wagga City Council has developed detailed designs for upgrades to the Main City and North Wagga Levees. The design for the Main City Levee is to upgrade it to a 1 in 100 year level of protection (1% AEP). 

The design for the North Wagga levees is for a potential upgrade to a 1 in 20 year level of protection (5% AEP). A report on alternative flood management options is expected to be presented to Council for consideration in July. 

Please take the time to ready the information in the Detailed Design Update before completing this survey.

This survey is open until Sunday 3rd May.

CLOSED: This survey has concluded.